Developing the overall infrastructure of Tashkent State Medical University through increasing financial efficiency, improving the material and technical base, digitalization, green energy and green economic approaches.
1. Centralization of Financial Services
• A unified financial center will be established for all institutions.
• A working group will be formed in cooperation with foreign experts and the ministry.
2. Renovation and Equipment of Student Dormitories
• Dormitory buildings will be renovated.
• Old equipment will be replaced with new installations.
3. Creating “Workout” Zones and Infrastructure
• Sports grounds, benches and waste bins will be installed on campuses.
4. Establishing a Print Shop
• A printing house equipped with modern printing equipment will be opened.
5. Updating the Clinic Infrastructure
• Laboratory and diagnostic equipment will be purchased.
• Large-scale reconstruction works will be carried out.
6. Digitalization and Transparency of Financial Activities
• All financial data will be posted on the official website. Paper exchange will be eliminated and switched to electronic format.
7–8. Green Energy and Economy
Solar panels, motion-sensor lighting and energy-saving pumps will be installed.
All buildings will undergo energy audits.
Thermal insulation will be ensured through basalt coverings.
9. “Green Space” Initiative
Over 2,400 trees and flower seedlings will be planted.
The irrigation system will be updated and laboratory equipment repaired.
10. Construction of New 1,340-Bed Dormitory
Will be built on a public-private partnership basis.
Student housing coverage rate will be increased.
11. Digitalization of the Educational Process
ICT tools will be purchased.
12. Video Surveillance System Implementation
750 cameras will be installed; monitoring will be carried out through “Transparent Construction.”